On-site today. Emergency Crews in hours. Call Now: (248) 988-9888

SAFETY LINE STRIPING & SPECIALTY COATINGS

High-visibility traffic markings, safety zoning, and specialty coating systems that improve compliance, reduce risk, and keep production moving.

28+ Years of Experience • Industrial & Commercial Only • In-House Crews • Night/Weekend Scheduling

Don’t see a time? Fill the form below or text/call (248) 988-9888

Standard Paint vs. High-Performance Striping

Comparison Factor Standard Parking Lot Paint Arberon Industrial Striping Systems
Durability Wears off in 3–6 months under forklift traffic. Engineered Epoxy/Urethane systems designed to last years, not months.
Adhesion Sits on top of dirt or concrete and peels easily. Shot-Blasted Embedment: Striping is mechanically embedded into the floor surface.
Cleanability Absorbs dirt and tire marks; cannot be aggressively scrubbed. Chemical-resistant and auto-scrubbable without loss of brightness.
Visibility Fades quickly; edges become ragged. High-gloss, crisp lines that maintain safety boundaries and OSHA compliance.
Swipe →

The Floor Plan Is a Safety System

Striping isn’t decoration — it’s operational infrastructure. Clear lanes, pedestrian walkways, and properly defined zones reduce near-misses, support safer workflows, and keep teams moving with confidence.

Line Striping & Floor Marking Applications

  • Forklift traffic lanes + intersections
  • Pedestrian walkways + crosswalks
  • Staging, WIP, and storage zones
  • Shipping/receiving + dock approach lanes
  • Battery charging and maintenance areas
  • Safety clearance zones around equipment
  • Directional arrows, numbering, and bay labeling
  • Hazard identification striping (caution zones)

Specialty Coatings for Safety + Durability

  • High-visibility safety color coating zones (staging, walk paths, hazard areas)
  • Anti-slip traction coatings for ramps, entries, and transition areas
  • Clear protective topcoats in high-abrasion areas (where appropriate)
  • Spot protection for equipment zones, work cells, and repeated impact areas

Systems Matched to Your Environment

We tailor systems for heavy forklift traffic, turning zones, downtime-limited areas (phasing), interior/covered exterior applications, and fast return-to-service requirements.

Prep-Driven Results (Why Striping Fails)

Most failures come from shortcuts: poor cleaning, bad surface profile, or rushing cure time. Our process prioritizes adhesion and clarity so markings stay sharp longer.

Our Method

  • Site walkthrough + measurements + layout planning
  • Surface cleaning/targeted prep
  • Layout + masking (clean geometry, consistent widths)
  • Application + cure management
  • Final walkthrough + punch list

Best-Fit Environments

Automotive & Tier Suppliers • Warehouses/Distribution • Manufacturing/Assembly • Municipal/Institutional

Why Facility Leaders Choose Arberon

  • 28+ Years of Experience
  • In-House Crews
  • Night/Weekend Scheduling
  • Facility-First Planning (safety + throughput)

Our Primary Service Regions

We deploy quickly for walkthroughs and on site execution across our primary service regions.

Michigan (Primary Service Region)
Northern Ohio
Parts of Indiana
Select projects beyond, on request
Safety Line Striping Brochure

Download the Safety Line Striping Brochure

Want to share this internally? Download the 2-page brochure.

Ready to Improve Safety and Flow in Your Facility?

Schedule Walkthrough
  • Licensed, Bonded, Insured, OSHA-Trained Crews
  • “20+ Years Without a Lost-Time Incident”
Full safety documentation available upon request

Contact Arberon

×

Contact us